Hangzhou EPG Co.,Ltd. , was founded in November, 1997. With its five wholly owned subsidiaries. Our organization pays particular interest to customers’ demands, listening to the certain demands of every consumer and guaranteeing overall pleasure. Provider & Quality controlWe supply detailed drawings and offer you every time essential. The purpose of 135m ending mill team
The finishing mill team is composed of leading crossed forty five deg EPT-pace wire-rod ending mills period
The ending mill group is situated in substantial-velocity wire-rod workshop interval By way of 10 device rack the constant micro-pressure rolling mill will be transported upstream AElig seventeen ~ AElig 21mm of rolling comma rolling grow to be AElig five period5 ~ AElig 16mm concluded wire period of time The operating speed of 90m sols is insured interval The specification of conclude product is AElig five period5mm interval
Structural characteristics of ending mill
Finishing mill unit is merged with 10 mills comma velocity rising box comma help base comma arc coupling comma waterproof slot comma watertight plate comma the protective include comma piping and XiHu (West EPT) Dis.Hu (West EPT) Dis. of finishing mill period Mill frame is composed of three AElig 200mills and seven AElig a hundred and fifty mills comma body use prime crossed forty five deg Composition form to achieve no EPTing comma no speak to aXiHu (West EPT) Dis.s comma tiny aXiHu (West EPT) Dis.s and EPT for tools comma apart from comma it lower the cEPTTr of gravity height comma the steadiness enhanced as well comma in the imply time comma the complete weigh has lower and it is straightforward to maintain time period 10 frames are concentrated EPTT interval
Roll frame is composed of roller box comma EPTTl EPTT and spare components of EPTTl EPTT period
Roller box and EPTTl EPTT undertake outdoors combinational instruction comma lower the measurement of EPTTl EPTT to lessen the weigEPTT of finishing mill comma lower the place of mills to make their construction compact period Roller box utilised cantiEPT roll loop comma there is eccentric locking collar in the box to alter roll gap period of time Film bearing and roll shaft are within eccentric locking collar comma EPTTr sleeve is used to repair roll loop which is in the stop of roll shaft time period
EPTTl EPTT is composed of box comma EPTT box comma spiral EPTTl EPT roll and synchronized EPTs time period All EPTs are hardened grinding EPT comma EPTtooth correction is essential time period The precision degree of spiral EPTTl EPTT is six and spherical EPTTl EPTT is five to insure the sleek functioning of substantial velocity interval
Roller box and EPTTl EPTT are connected by bolts comma a portion of roller box plug into the EPTTl EPTT to allow two synchronized EPTs in EPTTl EPTT meshed time period Roller box and EPTTl EPTT are mounted by two finding pin comma the roller box with same specification can be transformed interval
The aXiHu (West EPT) Dis.al force of the roll shaft beared by a pair of thrust ball bearings comma this ball bearing mounted on the aXiHu (West EPT) Dis.al clearance in the absence of the EPTT washer comma because the very modest aXiHu (West EPT) Dis.al clearance ball itself comma for that reason the roll shaft to correctly positioned in the aXiHu (West EPT) Dis.al route comma which ensures correct roll rolling precision comma which is to ensure the dimensional precision of the workpiece interval
The roller shaft close to the movie bearing is created in the form with EPTTr comma so the roller shaft can bear uniform load distribution even it is bend time period So the life span of roller can be improved period
Roller loop is tungsten carbide comma it is linked on the cantiEPT roll shaft comma we use the certain EPT altering roll equipment to substitute roll loop comma it is convenient and easy time period
Lubrication of the team colon Dilute oil focus lubricated
Method oil stress colon period35~ period6MPa
Consumption colon 1500L solmin
Oil colon Mobil 525
Cleanliness colon 10m
Cooling water of roll shaft
Water pressure colon period6MPa
Consumption colon MaXiHu (West EPT) Dis.mum is 10 acute 30m3 solh
EPT stress system of protective protect colon
Functioning strain colon 20MPa
Technique circulation colon 35 l solmin
Composition of EPTT colon AElig 200 mills lparthree rpar comma AElig 150mills lparseven rpar comma guild fittings comma velocity rising box comma support foundation comma flap comma water-resistant slot comma buffer tank comma the protective cover comma couplings and pipework of finishing mill period of time